Camera13’s client in DRC, Kinshasa benefited from our flexibilities and Quick turnaround time, after their initial contracted production house withdrew from the project, due to political instabilities around Run-off elections late 2006. We were informed that rebel troops had withdrawn from positions in town.
Two advertisements were shot. Language on set was predominantly French, with two English translators present at all times. During the first production, we assisted the post-production with technical expertise, incorporating HD P2 workflow and actual edit, in accordance to clients storyboard. The second product was entirely post produced by camera13 in Johannesburg.
Back to Recent Video